Agenda Item
Meeting Date:
9/14/2023 - 5:15 PM  
Category:
APPROVAL OF CONSENT AGENDA  
Type:
Action  
Subject:
AHS Second Floor Connector Design - RFP Selection Committee  
ACPS Division Objective :
Goal 3
Equitable, Transformative Resources
 
Policy:
FEA - Facility Design  
Enclosure:
 
File Attachment:
 
Summary:
Through the AHS and WAHS High School Master Plan completed in 2022, a high priority for AHS was determined to be a second floor connector wing to improve circulation and provide additional innovative spaces. The second floor connector will improve circulation throughout the building, add classroom capacity, expand student breakout space, and provide improved teacher professional space. The project concept involves a 1,500 square foot renovation inside the existing building with a 9,700 square foot addition/expansion that includes 3 additional classrooms, and additional spaces dedicated to teachers.

Based on School Board Policy FEA- Facility Design, an Architectural/Engineering Selection Committee is to be appointed jointly by the School Board and the Superintendent, when the fee for such services will exceed $100,000. As such, we recommend the following members of the Architectural/Engineering Selection Committee:

William Schaffer, Assistant Principal for AHS
Katina Dudley, Lead Coach - Science, Health & Family Life Education
Sheila Hoopmann, Senior Project Manager
James Allen, Project Manager/Inspector
April Newton, Project Manager/Project Inspector
 
Funding:
Funding for design services for the project is included in the FY24 CIP budget.  
Recommendation
Approve the Architectural/Engineering Selection Committee for the Albemarle High School Second Floor Connector project.  
Approvals:
Recommended By:
Signed By:
Lindsay Snoddy - Director of Building Services
Signed By:  
Rosalyn Schmitt - Chief Operating Officer
Signed By:  
Dr. Matthew Haas - Superintendent